TP 12V TP metro sites (116 sites 150Ah +41 Sites 100Ah)

TP 12V TP metro sites (116 sites 150Ah +41 Sites 100Ah)

TP 12V TP metro sites (116 sites 150Ah +41 Sites 100Ah)

  • Nation wide project with the split of North-South-central Region.
  • Success ratio of the project was 100% with the complete PAC’s signing of all sites .