TP 110 High Ratting Battery Project (63 Solar + 47 USF)

TP 110 High Ratting Battery Project (63 Solar + 47 USF)

TP 110 High Ratting Battery Project (63 Solar + 47 USF)

  • Nation Wide Sites with the most difficult terrain of South-Central-North region.
  • Regional distribution: South (42 sites) North(33 sites) Central (35 sites)
  • Success ratio of the project was 100%
  • The milestone of the project was to executed the 110 sites within 10 days.