39.6 MW Kaigah-II Hydropower Project

After the issuance of Letter of Intent (LOI) from the Pakhtunkhwa Energy Development Organization (PEDO), ATL is working on the development of 24 MW Kaigah-ll Hydropower Project. This project is proposed on Thouti Nullah, left tributary of Kandiah River in District Kohistan of Khyber Pakhtunkhwa. Integral, SA of Columbia is working as consultants for the project.

The main objectives of hydropower projects are to provide cheap hydroelectric power to the national grid system and to lessen the prevailing high cost of power supply; mainly due to the thermal powerhouses as base load stations. The proposed K-II Hydropower Project will eventually become a part of low cost power generation system.