As a developer, ATL has undertaken 2.2 MW Machai Hydropower Project which is a low head hydropower scheme located on Machai canal in District Mardan of Khyber Pakhtunkhwa.

As a developer, ATL has undertaken 2.2 MW Machai Hydropower Project which is a low head hydropower scheme located on Machai canal in District Mardan of Khyber Pakhtunkhwa.

The Project is under construction and commissioning is expected by the mid of 2017

It is worth mentioning that the project has been developed from a scratch solely by utilizing the expertise of ATL in planning, engineering designing and execution.

Design Discharge   = 45.93 m3/s  Design Head   = 5.94 m

Plant Factor   = 74%  Annual Energy   = 13.92 GWh

1 2